国产精品沙发午睡系列_久章草在线无码视频观看_三级国产国语三级在线_亚洲精品国产嫩草在线观看东京热_人成午夜大片免费视频77777_日本大片免费视频在线_综合久久久久久综合久_东京热久久综合伊人av_青草久久久国产线免费_亚洲国产精品成人久久久

Language:CHINESESENGLISH

Home > News > Steel plant welding process
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.yxfgs.cn

Steel plant welding process

Time:[2014-6-11]  Hits:5891

Foshan Steel plant welding process
Such issues directly affect the quality of the project are the main issues, so this type of problem must use professional testing tools through a professional testing company can detect, judge it, generally based on the shortcomings of the type of weld into slag, not fusion and pores.

 

Welding processes. The processes are hidden works, one of the most easy to attack process quality problems, from 2004 a company's product quality report statistics show that the onset of the process of quality problems: Because the quality of welding seam failure rates resulting in up to 80% , followed the wrong procedure is due to operational and technical issues of the operator and the resulting weld quality problems accounted for about 10%.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號