国产精品沙发午睡系列_久章草在线无码视频观看_三级国产国语三级在线_亚洲精品国产嫩草在线观看东京热_人成午夜大片免费视频77777_日本大片免费视频在线_综合久久久久久综合久_东京热久久综合伊人av_青草久久久国产线免费_亚洲国产精品成人久久久

Language:CHINESESENGLISH

Home > News > Guangzhou Steel News: Project Synthesis Division first building block hoisting steel
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.yxfgs.cn

Guangzhou Steel News: Project Synthesis Division first building block hoisting steel

Time:[2015-6-13]  Hits:6017

Guangzhou Steel News: Project Synthesis Division first building block hoisting steel

Lifting command followed by a crisp whistle, a formal lifting steel building blocks. The sound of firecrackers, oil synthesis A Lot exhaust decarbonization unit, two steel structure building blocks of a total weight of 86 tons a steadily lifting module, launched.

    Exhaust decarbonization unit steel frame structure constructed two total height of 69.5 meters, in order to reduce the risk of installation, saving construction costs of labor, machinery, and other aspects of erecting erection, ten construction projects Shenhua Ningxia Coal Ministry through planning, we decided to take the floor and modular assembly Lifting mode. Each module is all assembled on the ground, including all the ladders, railings, steel grating and all other intermediate coat and topcoat construction and corrosion work, then hoisting respectively. The lifting module a structure the size of 7 × 8 × 14.3 m lifting height of 44.8 meters.

    Before lifting, for all personnel involved in the project department conducted safety tests, lifting, lifting the entire process lasted 35 minutes, the module in place a stable altitude of 45 meters, and for the next module lifting laid the foundation. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)